GE?s PBA guarantee takes into consideration availability, while at the same time balancing peak production on wind turbines wind farm wide. GE?s installed base of 17,000 wind turbines has been an industry leader.
Continue readingGE?s PBA guarantee takes into consideration availability, while at the same time balancing peak production on wind turbines wind farm wide. GE?s installed base of 17,000 wind turbines has been an industry leader.
Continue reading